Barrow Gas Fields Well Drilling Program

  • Client/Owner:
  • Location:
  • Duration:
  • Manhours Expended:
  • North Slope Borough
  • Prudhoe Bay, Alaska
  • 2009 – 2010
  • 58,000

CONAM along with native partner Tikigaq of Pt. Hope, Alaska and design engineer, Design Associates, provided turn-key structural, mechanical and electrical design, procurement and installation for three (3) new double gas well locations at three (3) remote Barrow Gas Field sites.  Installations included single well platform w/two well houses, pipelines, separator, methonol tank, and a new SCADA system w/control panels for each well site. 

Work also included VSM drilling and setting, cased road crossings, launcher and receiver, and modifications to the fields Primary Gas Handling Facility.

The entire project was completed with a perfect safety record and under the North Slope Borough’s budget.