Kuparuk CPF-1 Smokeless Flare & DS-1H Modules

  • Client/Owner:
  • Location:
  • Duration:
  • Manhours Expended:
  • ARCO Alaska, Inc.
  • Anchorage, Alaska
  • May 1991 – October 1991
  • 26,400

 Work scope included the assembly and transportation of Production & Pig Receiver Module 504 weighing 103 tons, DS-1H electrical and Chemical Injection Module weighing 64 tons, and CPF-1 Smokeless Flair Module weighing 40 tons.  The 103 ton module was the heaviest module transported by truck to Prudhoe at that time.  Fabrication of the structural steel was performed by a local fabricator, pipe fabrication was performed by a Washington state fabricator, and erection of  the steel, pipe, electrical, etc was performed by CONAM in an Anchorage fabrication facility.

Transportation was accomplished using a heavy lift crane, securing and then trucking by a local subcontractor to the Kuparuk facilities.