BPX Hurl State Waterflood Modules

  • Client/Owner:
  • Location:
  • Duration:
  • Manhours Expended:
  • BP Exploration (Alaska), Inc.
  • Anchorage, Alaska
  • May 1991 – October 1991
  • 10,650

 Work scope included the assembly and transportation of Process Module 504 weighing 56 tons and Methanol Tank Skid 505 weighing 30 tons.  Fabrication of the structural steel was performed by a local fabricator, pipe fabrication was performed by a Washington state fabricator, and erection of  the steel, pipe, electrical, etc was perfomed by CONAM in an Anchorage fabrication facility.

Transportation was accomplished by jacking up the modules, moving transporter underneath, lowering, securing and then trucking by a local subcontractor to the Prudhoe Bay facility.