Bonneville Central Ferry Substation

  • Client/Owner:
  • Location:
  • Duration:
  • Manhours
  • Bonneville Power Administration
  • Southestern Washington
  • June 2012 – January 2012
  • 11,750

As a subcontractor to Quanta Services affiliate PAR Electric, pre-mobilization work scope included pre-assembly and BETA testing of radio communication equipment prior to sending components to eleven (11) field sites; Field site work included erection of two (2) 150 foot towers, a 35 foot tower, and two (2) 25 foot towers with associated antennas.

Addditional work included:  installation of antennas on three (3) existing towers; waveguide and ice sheilds from towers to the communications building; equipment and racks; and fiber optic cable tie-ins of three (3) of the eleven (11) sites.